Final Assessment
Final Quiz
Choose the best answer for each question.
1. What should be checked first before electrical work begins?
The paint colour
Authority, scope and safety controls
The cheapest cable
2. What does PEW mean?
Prescribed electrical work
Portable energy wattage
Protected earth wire
3. Who should confirm current regulatory requirements?
A social-media post
Official current sources and authorised professionals
An old invoice
4. What is the purpose of safe isolation?
To reduce the power bill
To prevent inadvertent energisation and prove de-energised
To test Wi-Fi
5. What does an RCD principally monitor?
Residual current imbalance
Room temperature
Cable colour
6. What is NZECP 51 associated with?
Limited homeowner/occupier wiring work
Vehicle registration
Plumbing
7. May a homeowner assume all domestic work is permitted?
Yes
No, the exemption is limited and conditional
Only at night
8. Why are test records important?
Decoration
Traceability and evidence of verification
Advertising
9. What can a loose connection cause?
Overheating and fire risk
Better efficiency
Lower voltage drop always
10. What should happen when authority or test results are uncertain?
Continue quickly
Stop and obtain competent guidance
Guess
11. What does MEN refer to?
Multiple Earthed Neutral
Main Energy Network tariff
Meter Equipment Number
12. What is a visual inspection for?
Identifying visible damage, suitability and workmanship issues
Replacing every circuit
Setting internet speed
13. Why are standards not copied into this academy?
They are copyrighted and current editions must be authorised
They are irrelevant
They contain no rules
14. What is high-risk work likely to involve?
Additional controls and independent inspection where required
No paperwork
Only painting
15. What is polarity testing intended to verify?
Correct conductor connections and switching arrangements
Room humidity
Network billing
16. Why must instruments be checked?
To confirm condition, rating and operation
To make them heavier
To change colours
17. What is the safest approach to live work?
Avoid it and follow lawful risk controls
Use one hand without planning
Work faster
18. What should a defect report contain?
Clear facts, location, evidence, risk and recommended action
Jokes only
No dates
19. What is preventive maintenance intended to do?
Find deterioration before failure or harm
Remove labels
Avoid records
20. What completes a compliant job?
Installation only
Verification, documentation, certification and handover as required
Payment only
Mark Quiz