Module 15 · Lesson 1

Control narratives, I/O lists and functional design

Turn process requirements into testable control narratives, cause-and-effect tables and I/O definitions.

Learning outcomes

  • Explain the key principles of control narratives, i/o lists and functional design.
  • Carry out a structured practical check or configuration task.
  • Recognise common faults, risks and evidence needed for diagnosis.

Before you begin

Process description, P&IDs and stakeholder requirements.

Safety: Use site procedures, approved test equipment and competent supervision. Never bypass a protection or interlock without formal control.

Step-by-step learning

  1. Define normal modes, sequences, permissives, trips, alarms and fallback states.
  2. Build an I/O list with tag, type, range, units and fail state.
  3. Create cause-and-effect tables for critical events.
  4. Review the design with operations, maintenance and safety personnel.
Ian's practical tips:
  • Ambiguity discovered on paper is cheap; ambiguity discovered during commissioning is expensive.
  • Write requirements so each statement can be tested.

Fault-finding questions

  • What should be happening, and what evidence proves it?
  • Where is the last known correct signal, voltage, state or process condition?
  • What changed immediately before the fault?
  • Can the system be divided into smaller testable sections?

Practical activity

Create a one-page test record for this lesson. Include expected values, measured results, equipment used, risks controlled, defects found and the final proven condition.