1. Motor starter commissioning
Develop drawings and a commissioning sheet for a DOL or reversing starter, including overload and interlock tests.
Ten structured projects that integrate electrical, PLC, instrumentation, networking, telemetry and SCADA skills.
Develop drawings and a commissioning sheet for a DOL or reversing starter, including overload and interlock tests.
Configure a VSD and simulated pressure transmitter for PID control, sleep/wake and fault handling.
Program duty rotation, automatic changeover, low-level trip, failed-to-start alarm and runtime balancing.
Build reusable motor, valve and analogue-input blocks with commands, status, alarms and maintenance modes.
Integrate a Modbus RTU or TCP device, document the register map and expose communications quality.
Configure event classes, deadbands, time synchronisation, quality and select-before-operate controls.
Create overview, detail, alarm and trend screens for the pump station using consistent symbols and permissions.
Produce an IP plan, VLAN design, switch configuration backup and network acceptance-test report.
Use alarms, trends, PLC events and packet capture to produce a timeline and root-cause report.
Deliver the complete integrated pump-station design, software, test evidence, backups and operator handover pack.