Module 15 · Lesson 4

Capstone integrated industrial project

Design, program, commission and document a complete pump station with VSD, PLC, instrumentation, Modbus/DNP3 telemetry and Wonderware SCADA.

Learning outcomes

  • Explain the key principles of capstone integrated industrial project.
  • Carry out a structured practical check or configuration task.
  • Recognise common faults, risks and evidence needed for diagnosis.

Before you begin

Training simulator or documented design exercise.

Safety: Use site procedures, approved test equipment and competent supervision. Never bypass a protection or interlock without formal control.

Step-by-step learning

  1. Produce P&ID, control narrative, I/O list, network plan and cause-and-effect matrix.
  2. Program duty/standby pumps, level PID, alarms, interlocks and manual/auto modes.
  3. Integrate a Modbus device, DNP3 remote points and SCADA graphics/trends.
  4. Complete FAT/SAT tests, backups, operating instructions and fault-finding guide.
Ian's practical tips:
  • Treat the capstone as a real handover package, not only a programming exercise.
  • The strongest project is easy for the next technician to understand and maintain.

Fault-finding questions

  • What should be happening, and what evidence proves it?
  • Where is the last known correct signal, voltage, state or process condition?
  • What changed immediately before the fault?
  • Can the system be divided into smaller testable sections?

Practical activity

Create a one-page test record for this lesson. Include expected values, measured results, equipment used, risks controlled, defects found and the final proven condition.