Learning outcomes
- Explain the key principles of capstone integrated industrial project.
- Carry out a structured practical check or configuration task.
- Recognise common faults, risks and evidence needed for diagnosis.
Design, program, commission and document a complete pump station with VSD, PLC, instrumentation, Modbus/DNP3 telemetry and Wonderware SCADA.
Training simulator or documented design exercise.
Safety: Use site procedures, approved test equipment and competent supervision. Never bypass a protection or interlock without formal control.
Create a one-page test record for this lesson. Include expected values, measured results, equipment used, risks controlled, defects found and the final proven condition.