Module 4 · Lesson 2

Pump starters, interlocks and level control

Build reliable pump control using level, pressure, flow, duty/standby rotation and dry-run protection.

Learning outcomes

  • Explain the key principles of pump starters, interlocks and level control.
  • Carry out a structured practical check or configuration task.
  • Recognise common faults, risks and evidence needed for diagnosis.

Before you begin

Control narrative, P&ID, I/O list and level/pressure instruments.

Safety: Use site procedures, approved test equipment and competent supervision. Never bypass a protection or interlock without formal control.

Step-by-step learning

  1. List every start permissive, stop condition, alarm and trip.
  2. Define duty/standby selection and automatic changeover behaviour.
  3. Test low-level, high-level, pressure, flow and overload interlocks individually.
  4. Confirm the pump state shown on SCADA matches actual feedback, not merely the command.
Ian's practical tips:
  • Use separate “commanded”, “running” and “available” states. They are not the same thing.
  • A failed feedback timer is one of the best ways to catch a broken coupling or failed contactor.

Fault-finding questions

  • What should be happening, and what evidence proves it?
  • Where is the last known correct signal, voltage, state or process condition?
  • What changed immediately before the fault?
  • Can the system be divided into smaller testable sections?

Practical activity

Create a one-page test record for this lesson. Include expected values, measured results, equipment used, risks controlled, defects found and the final proven condition.